UK Exhibition Stand Rules 2026: What 18 Exhibitor Manuals Require

By:
David Stewart
November 18, 2026
16
min read

The short version

There is no single UK rule: across 18 UK exhibitor manuals from 2026, most capped stands at 4m and wanted stand plans a median of 40 days before build.

  1. 4m was the most common height cap, and three shows needed approval to go above 2.5m.
  2. Stand plans and RAMS were due a median of 40 days before build, and up to 13 weeks.
  3. 10 of 18 manuals named an official electrical contractor you have to use.
  4. Stand builders got a median of 9h 30m to build and 5h 15m to break down.

There is no single UK rule for exhibition stands. Every organiser sets its own limits in the exhibitor manual. Across 18 UK manuals from 2026, the most common height cap was 4m, stand plans and RAMS were due a median of 40 days before build, and 10 of the 18 named an electrical contractor you have to use.

We read the exhibitor manuals, technical guides and organiser packs from our 2026 stand projects and pulled out the rules that shape a stand’s design and build. Use the show finder to look up your event, then the charts to see how much the rules vary.

4mMost common height cap (7 of the 12 shows that set one)
40daysMedian time between the stand plan deadline and build day
10/18Manuals naming an official electrical contractor
2hrsShortest breakdown window we saw. The median was 5h 15m

Show finder

Find the rules for your show

The key build rules from each 2026 manual. Search by show, venue or city. Rules change between editions, so check your current manual before you sign off a design.

AgriScot

Royal Highland Centre · Nov 2026

Shell scheme
Max height
3m
Plans due
None
No approval step; PL and EL cover of £5m each
Build access
22h 30m
Breakdown
6h
Height detail
3m including signs and exhibits
Open sides
Shell scheme, front open
Platform and ramp
No floor fixings
Electrics
Booked through organiser form
  • Organiser runs the forklift and telehandler
  • Breakdown is the same night, 18:00 to midnight
Exhibiting at AgriScot? Get a 3D design →

BBTS Annual Conference

SEC Glasgow · Sep 2026

Space only
Max height
4m
Plans due
38 days
before build
Build access
9h
Breakdown
6h
Height detail
Partition walls 2.5–4m; over 4m is a complex structure
Open sides
Island back walls up to ½ of side
Platform and ramp
Section 89 permission at 600mm+
Electrics
Official contractor Cameron Event Logistics
  • Steel toe caps for all construction crew
  • Section 89 application due 28 days before build
Exhibiting at BBTS Annual Conference? Get a 3D design →

BSIR

ICC Birmingham · Nov 2026

Space only
Max height
4m
Plans due
33 days
before build
Build access
11h
Breakdown
7h 15m
Height detail
2.5m standard; 4m centre, 3m under gallery with approval
Open sides
Solid up to 20–30%, with permission
Platform and ramp
Max 70mm floor; ramp from 40mm, 1m wide
Electrics
No named contractor; BS 7671 and inspection
  • Exhibits and counters 500mm back from the stand edge
  • Hot works permit 3 weeks before the event
We’ve built here: Medtronic @ BSIR 25 Exhibiting at BSIR? Get a 3D design →

EAIE Conference

SEC Glasgow · Sep 2026

Space only
Max height
4m
Plans due
61 days
before build
Build access
20h
Breakdown
10h 30m
Height detail
2.5m standard; 4m with a fee (10% of space cost)
Open sides
Closed up to 30%
Platform and ramp
Max 100mm; ramp inside stand, 1.5m wide
Electrics
Ordered through the organiser
  • Walls above 2.5m solid white on every outer face
  • Carbon footprint data required before build starts
Exhibiting at EAIE Conference? Get a 3D design →

Energy Innovation Summit

SEC Glasgow · Nov 2026

Space only
Max height
4m
Plans due
49 days
before build
Build access
21h
Breakdown
3h
Height detail
3m up to 12m², 4m above; 4m+ is complex
Open sides
Islands at least ½ open; long walls step back 1m
Platform and ramp
Ramp over 13mm, max 1:12
Electrics
No named contractor; tested before power-up
  • Online site induction for every contractor
  • No cables under carpet or up support posts
We’ve built here: SSEN @ Energy Innovation Summit 23 Exhibiting at Energy Innovation Summit? Get a 3D design →

European Microwave Week

ExCeL London · Oct 2026

Space only
Max height
5m
Plans due
92 days
before build
Build access
24h
Breakdown
15h 30m
Height detail
5m; back walls 2.5m
Open sides
Side walls up to ½ of length
Platform and ramp
Ramp over 40mm, 1m wide, 1:12
Electrics
Official contractor GES
  • Plan check fee £150–£450 by stand size
  • CEVA is the only forklift and lift operator
Exhibiting at European Microwave Week? Get a 3D design →

FIS International

SEC Glasgow · Nov 2026

Space only
Max height
4m
Plans due
Not stated
Build access
12h
Breakdown
6h
Height detail
4m; higher on application
Open sides
Aisle walls up to ½ of side
Platform and ramp
Not stated; hall not carpeted
Electrics
Official contractor Named on the organiser’s order form
  • One 12-hour build day, no extensions
  • Neighbour-facing walls finished white
Exhibiting at FIS International? Get a 3D design →

LiGHT

Business Design Centre · Nov 2026

Space only
Max height
2.74m
Plans due
28 days
before build
Build access
22h
Breakdown
10h 30m
Height detail
2.74m in the Gallery Bay, platform included
Open sides
At least ⅓ of each front open
Platform and ramp
Max 170mm; ramp or bevel
Electrics
Official contractor Business Design Centre
  • Mains box sits on your stand: design around it
  • Rear is visible from the Mezzanine: dress it
Exhibiting at LiGHT? Get a 3D design →

NSpine London

Royal Horseguards hotel · Sep 2026

Tabletop
Max height
Not stated
Plans due
Not stated
Build access
5h 15m
Breakdown
Not stated
Height detail
Freestanding only
Open sides
Within contracted space
Platform and ramp
Not stated
Electrics
On request from organiser
  • Grade I listed: no fixings to walls, pillars or doors
  • Everything must fit a 2.0m × 1.7m cargo lift
Exhibiting at NSpine London? Get a 3D design →

PHUSE EU Connect

SEC Glasgow · Nov 2026

Space only
Max height
5m
Plans due
51 days
before build · Design to organiser
Build access
3h
Breakdown
Not stated
Height detail
5m in Hall 2
Open sides
Not stated
Platform and ramp
Not stated
Electrics
No named contractor; basic power included
  • Platinum build slot is 3 hours
  • GES is the mandatory carrier for shipping
Exhibiting at PHUSE EU Connect? Get a 3D design →

PLSA Annual Conference

Liverpool Experience Campus · Oct 2026

Space only
Max height
4m
Plans due
45 days
before build
Build access
14h
Breakdown
8h
Height detail
4m including platform; no two-storey
Open sides
Solid up to ⅓
Platform and ramp
40mm recommended; ramped edges inside footprint
Electrics
Official contractor Full Circle Events
  • No induction, no entry
  • Wood, carpet and vinyl waste must leave with you
Exhibiting at PLSA Annual Conference? Get a 3D design →

Procurex Scotland

SEC Glasgow · Oct 2026

Space only
Max height
Not stated
Plans due
34 days
before build · Late submissions declined
Build access
9h
Breakdown
2h
Height detail
Not stated
Open sides
Not stated
Platform and ramp
Protect the venue floor
Electrics
Official contractor Space Events
  • Drapes, artificial flowers and polystyrene banned
  • Everything off site 2 hours after close
Exhibiting at Procurex Scotland? Get a 3D design →

SCPS Congress

EMCC Nottingham · Nov 2026

Space only
Max height
2.5m
Plans due
26 days
before build
Build access
10h
Breakdown
2h 45m
Height detail
2.5m free-build; features to 3m case by case
Open sides
Keep sightlines clear
Platform and ramp
Protection panels under own carpet
Electrics
No named contractor; venue supplies power
  • Loading door 2.6m high × 2.3m wide
  • Breakdown is 2h 15m before a gala dinner
We’ve built here: Terumo @ SCPS 26 Exhibiting at SCPS Congress? Get a 3D design →

The Business Show

ExCeL London · Nov 2026

Shell scheme
Max height
Not stated
Plans due
46 days
before build · H&S form
Build access
6h
Breakdown
3h 30m
Height detail
Shell scheme pack only
Open sides
Shell scheme
Platform and ramp
Shell scheme
Electrics
Official contractor Creative Live
  • Battery packs as mains power are banned at ExCeL
  • Parking must be pre-booked
Exhibiting at The Business Show? Get a 3D design →

Vascular Societies' ASM

Liverpool Experience Campus · Nov 2026

Space only
Max height
Not stated
Plans due
14 days
before build
Build access
8h
Breakdown
4h 30m
Height detail
Not stated (hall is 6.5m)
Open sides
Keep sightlines clear
Platform and ramp
Not stated
Electrics
Official contractor Pickard Events
  • Extra power can't be added once the stand is built
  • Drapes must meet BS 5867
Exhibiting at Vascular Societies' ASM? Get a 3D design →

What we take care of

What the manual asks for, and what we handle

Every rule in the show finder lands on someone’s desk. When we build your stand, most of them land on ours.

The manual asks for
What we do
Getting the exhibitor manual and floorplan
We can ask the organiser for them on your behalf.
Maximum height and open-side rules
We design within them from the first 3D concept, so nothing has to be cut back later.
Scaled stand plans for approval
We draw them and prepare them for the organiser’s deadline.
Risk assessment and method statement (RAMS)
We write them for our build and breakdown, ready to submit.
Electrics from the official contractor
We work out how much power your stand needs and can fill in the booking form for you.
Short build and breakdown windows
Our own crews build and dismantle reusable modular frames, which go up fast.

Height

What is the maximum height for an exhibition stand in the UK?

It depends on the show, and sometimes on where your stand sits in the hall. Limits ran from 2.5m to 5m, and 4m was the most common cap. Three shows treated 2.5m as standard and needed approval, or a fee, to go higher. Some measure from the hall floor, so a raised floor counts.

In the manuals that define it, anything over 4m counts as a complex structure, which needs structural calculations and an independent engineer’s sign-off. Each organiser and venue sets its own definition, so check yours.

Design tipSmall stands can have a lower cap. One show limited stands of 12m² or less to 3m.

Maximum stand height by show

12 of 18 manuals set a limit · 2026 editions

Maximum stand height at 12 UK shows, 20260m1m2m3m4m5m2.5m: common default4m: most common capEuropean Microwave Week5mPHUSE EU Connect5mBBTS Annual Conference4mBSIR4mEAIE Conference4mEnergy Innovation Summit4mFIS International4mPLSA Annual Conference4mRoad Expo & Bridges Scotland4mAgriScot3mLiGHT2.74mSCPS Congress2.5m
AllowedAllowed with approval or a fee

Open sides

How much of an open side can be solid wall?

Organisers want visitors to see into stands and along the aisles, so most cap how much of an open side you can close off. The rule is written four different ways, and on a 6m side it means anything from 1.8m to 4m of solid wall.

On space only stands you build your own wall to each neighbour. Six manuals set a minimum of 2.5m, and six said the side facing a neighbour must be plain white or unbranded.

Design tipOne show made any aisle-facing wall 4m or longer step back at least 1m into the stand.

Solid wall allowed on a 6m open side

Four common ways the rule is written · 9 manuals

How much of a 6m open side can be solid wall under four common rules0m1m2m3m4m5m6mAt least ⅓ of each front open2 shows4.0m solidopenSolid wall up to ½ of the side4 shows3.0m solidopenNo more than ⅓ solid1 show2.0m solidopenClosed sections up to 30%2 shows1.8m solidopen

Platforms and ramps

When does an exhibition stand need a ramp?

Stands must be accessible under the Equality Act 2010, so a raised floor needs a ramp or bevelled edge. The trigger starts as low as 13mm. Where stated, ramps were 1m to 1.5m wide, no steeper than 1:12, and inside the stand, never in the aisle.

In Scotland, a stage or seating platform of 600mm or more also needs Section 89 permission from the council. Two SEC Glasgow manuals flagged it, one with a deadline 28 days before build.

Design tipA 40mm eco floor tile needs a ramped edge at most shows. Draw it into your footprint from the first concept.

Ramp triggers and maximum raised floors

Platform heights drawn to scale · 2026 manuals

Platform heights that trigger a ramp, and the highest raised floors allowedHall floor13mmRamp over 13mm40mmRamp from 40mm70mmMax raised floor 70mm100mmMax raised floor 100mm170mmMax raised floor 170mm
Height that triggers a rampHighest raised floor allowed

Deadlines

How far in advance are stand plans and RAMS due?

For space only stands, organisers want scaled plans, a risk assessment and method statement (RAMS), usually a Construction Phase Plan and proof of insurance before they approve the build. The median deadline was 40 days before build, but one large ExCeL show wanted plans 13 weeks out, and one organiser said late submissions would simply be declined.

  1. –Plans due if your show sets the earliest deadline we saw (92 days)
  2. –Plans due at the median (40 days). Sign off the design before this
  3. –Plans due at the latest deadline we saw (14 days)

A guide based on 14 2026 UK manuals. Your show’s manual sets the real date.

Days between the plan deadline and build day

14 shows that gave a date · 2026 editions

Days between the stand plan deadline and the first build day, 14 UK shows020406080100Median: 40 daysBuild dayEuropean Microwave Week92EAIE Conference61PHUSE EU Connect51Energy Innovation Summit49The Business Show46PLSA Annual Conference45Road Expo & Bridges Scotland42BBTS Annual Conference38Procurex Scotland34BSIR33LiGHT28SCPS Congress26EA Masters24Vascular Societies' ASM14

Build and breakdown

How long do you get to build and break down?

Less than most exhibitors expect. The median stand builder got 9h 30m to build and 5h 15m to break down. Five shows allowed three hours or less for breakdown, and one sponsor slot gave three hours to build.

Short windows favour modular frames that go up fast, graphics that slide in rather than being fixed on site, and a crew that has rehearsed the build.

Access tipCheck the way in as well as the time. One hotel venue’s cargo lift was 2.0m × 1.7m, one conference centre’s loading door 2.6m high, and Liverpool’s Loading Bay 2 has a 4.3m limit.

Hours of access for stand builders

18 shows · build includes any dressing time

Hours of build and breakdown access for stand builders at 18 UK showsBuildBreakdown0h5h10h15h20h25hEuropean Microwave WeekBuild: 24hBreakdown: 15h 30m24hAgriScotBuild: 22h 30mBreakdown: 6h22h 30mLiGHTBuild: 22hBreakdown: 10h 30m22hEnergy Innovation SummitBuild: 21hBreakdown: 3h21hEAIE ConferenceBuild: 20hBreakdown: 10h 30m20hPLSA Annual ConferenceBuild: 14hBreakdown: 8h14hFIS InternationalBuild: 12hBreakdown: 6h12hBSIRBuild: 11hBreakdown: 7h 15m11hSCPS CongressBuild: 10hBreakdown: 2h 45m10hBBTS Annual ConferenceBuild: 9hBreakdown: 6h9hProcurex ScotlandBuild: 9hBreakdown: 2h9hECVS Annual MeetingBuild: 8hBreakdown: 3h8hRoad Expo & Bridges ScotlandBuild: 8hBreakdown: 2h 45m8hVascular Societies' ASMBuild: 8hBreakdown: 4h 30m8hThe Business ShowBuild: 6hBreakdown: 3h 30m6hNSpine LondonBuild: 5h 15m5h 15mEA MastersBuild: 5hBreakdown: 3h 30m5hPHUSE EU ConnectBuild: 3h3h

Electrics

Can I use my own electrician on an exhibition stand?

Often not. 10 of 18 manuals named an official electrical contractor, and most allowed no other electrician on site. Where none was named, work still had to meet BS 7671 and pass an inspection before power-up.

No cables

under carpet

Stated outright in 4 manuals. Use ramped covers, run cables under a platform, or drop them from above.

PAT

on everything

Every appliance needs an in-date test, extension leads and laptops included.

No batteries

as mains power

Banned in the ExCeL London and Liverpool Experience Campus manuals.

30 min

power-off after close

Stand power usually goes off soon after the hall closes. Order 24-hour power for fridges.

Fire and safety

What fire standard do stand materials need to meet?

In UK manuals the usual standard is BS 476 Part 7 Class 1, with certificates kept on the stand. Five manuals cited it by name. Organisers based outside the UK may ask for European classes instead (Euroclass B-s1,d0).

25mm

Timber

Anything thinner must be treated to Class 1.

18mm

Boards

Thinner boards must be treated. MDF is usually exempt but can’t be cut on site.

6mm

Glazing

Safety glass at least 6mm thick, with markings on large clear panes.

4 of 18

Artificial plants

Banned or restricted. Treated, certified plants are usually accepted.

CDM 2015

Build day is a construction site

Six manuals applied the CDM Regulations to build and breakdown.

Hi-vis

PPE at almost every show

Hi-vis and safety footwear as a minimum. Venues don’t keep stock, so bring your own.

16+

Age limits on build

Six shows banned children from the hall during build: four set 16, two set 18.

Built to the rules

Stands we’ve designed around these manuals

Every stand we build starts with the manual: deadlines flagged, heights checked, ramps drawn in before the first visual.

Planning a stand

How to use this when you plan a stand

  1. Get the manual when you book

    Ask for the exhibitor manual, technical guide and any health and safety pack. Rules are often split across several documents.

  2. Find the plan deadline first

    It is usually the earliest date that affects design, and it sets your design sign-off date.

  3. Check height, sides and floor

    Height limit, open-side rule and ramp trigger decide the shape of the stand. Check them before the first concept.

  4. List the mandatory contractors

    Electrics, rigging, forklifts and catering are often exclusive to one supplier, with early-booking deadlines.

  5. Collect fire certificates as you buy

    Keep copies for fabrics, boards and timber on the stand for inspection.

  6. Get “not stated” confirmed in writing

    A rule missing from the manual doesn’t mean there isn’t one. Ask the organiser.

Method

How we compiled this data

We reviewed the exhibitor manuals, technical guides and organiser packs for 18 UK shows running between July and November 2026, at venues including SEC Glasgow, ExCeL London, ICC Birmingham, Liverpool Experience Campus, the Business Design Centre, EMCC Nottingham and the Royal Highland Centre.

Some shows issued a full technical manual; others only a sponsor pack or an online portal, which is why some rules show as “not stated”. Lead times count calendar days from the stated deadline for stand plans or the health and safety submission to the first build day. Build and breakdown hours are the access windows for stand builders. Figures reflect the 2026 editions and were last checked in November 2026. We’ll update this page as the 2027 manuals arrive.

Before

After

Redblu in practice

Medtronic @ ECVS 26

Medtronic stand at ECVS 2026: island stand with a blue wall, a counter and clinicians at a demonstration station

The brief

A stand for Medtronic at the ECVS Annual Scientific Meeting in July 2026, at Liverpool Experience Campus.

The rules we designed around

One build window, 07:00 to 15:00 on the day before opening. Loading Bay 2 with a 4.3m height limit and a 30-minute unload. GES as the contracted stand builder for shell scheme and services, with a 20% surcharge on anything ordered once build had started.

Our approach

We got approval to build before the show and booked Wi-Fi through the venue portal in advance, so the eight-hour window went on building the stand, not chasing paperwork.

See the full project

Frequently asked questions

What is the maximum height for an exhibition stand in the UK?

There is no national limit. Each organiser sets one in its exhibitor manual. Across 18 UK manuals from 2026, 4m was the most common cap, two shows allowed 5m, and three treated 2.5m as standard unless the organiser approved more.

How far in advance do I need to submit stand plans?

Typically about six weeks before build. In the 14 UK manuals that gave a date, the median was 40 days before the first build day, ranging from 2 weeks to 13 weeks.

How long do stand builders get to build and break down a stand?

Less than most people expect. Across 18 UK shows the median build access was 9h 30m and the median breakdown window was 5h 15m. The shortest breakdown we saw was 2 hours.

Do I need a ramp on my exhibition stand?

If your stand has a raised floor, almost certainly. UK manuals set the trigger anywhere from 13mm to 40mm. The ramp or bevelled edge must sit inside your stand, not in the aisle, and is usually no steeper than 1:12.

Can I bring my own electrician to an exhibition?

Often not. 10 of 18 UK manuals named an official electrical contractor, and most allowed no other electrician on site. Book through the official contractor before the early-order deadline to avoid surcharges of 20% or more.

What is a complex structure at an exhibition?

A stand element that needs structural engineering. Each organiser and venue defines it in its own manual; the ones we read that define it usually include anything over 4m high, two-storey stands, suspended structures, and stages or platforms over 600mm for public use. It needs calculations and an independent engineer's sign-off.

What fire certificates do I need for an exhibition stand?

Most UK manuals ask for materials to meet BS 476 Part 7 Class 1, with certificates for fabrics, treated timber and boards kept on the stand. Untreated artificial plants are often banned.

The takeaway

Read the manual first and design second: height, open sides, ramps and deadlines decide what your stand can be.

Planning your exhibition stand?

You might also want to know:

Want us to read the manual for you?

Ready to exhibit?

We check every rule, flag every deadline and design to them from day one, from our two depots in Glasgow and Hampshire.

Tell us about your show and we'll come back with a 3D concept and a clear price.

Request a free quoteExplore this service