The short version
Aim to order your stand build about five weeks before the show, and allow more time if you can. Portable displays and graphics are quicker: we can handle them up to two weeks before you need them. Five weeks gives enough time for a design, revisions, graphics production and logistics without the final fortnight turning into a rush, which is when avoidable mistakes creep in.
The Short Answer by Product
| What you are ordering | Order at least |
|---|---|
| Stand build (package or custom) | About five weeks before the show |
| Larger or more technical builds | Earlier than five weeks |
| Portable displays and graphics | Up to two weeks before you need them |
These are minimums. Always allow more time if you can: it protects your choice of design, your revisions and your build slot.
Why Five Weeks Works for a Stand Build
Within five weeks there is time for the free 3D design and itemised price (back within 48 hours of your brief), at least one round of revisions, artwork sign-off, printing the fabric graphics, and planning delivery and the build slot with the venue. Book later than this and something usually gives: fewer revisions, rushed proofing of graphics, or a scramble on delivery logistics.
When to Book Earlier
Larger or more technical builds, such as double-height features, integrated AV or custom fabrication, need more design and production time. Busy venues like the NEC Birmingham and ExCeL London also book contractor capacity and delivery slots well in advance, and venue services such as power and internet often cost more when ordered late: at the NEC, for example, orders inside 28 days of build cost 20% more. If your show falls in a venue's peak period, book earlier still.
Portable Displays and Graphics
Banners, counters, lightboxes and other portable displays are normally delivered within 5 to 7 working days of print-ready artwork, so we can handle them up to two weeks before you need them. Leave a margin for artwork changes, courier delays and testing the display before the show. Printed shell scheme graphics follow the same rule.
What Happens If You Book Late
A late brief doesn't necessarily mean no stand. We can often still deliver on a compressed timeline, but it usually means fewer design revisions, less choice, and less flexibility if something needs to change close to the show. A fixed-price package stand from the Stand Selector is the quickest route, because the design and price are already settled.
How to Use the Time Well
Booking early only helps if the brief is ready. Have your show name and dates, stand size and open sides, logo and brand guidelines, what the stand must do, and a budget range if you have one. See our guide to writing a stand design brief. The more complete your brief, the more of the lead time goes into getting the design right rather than chasing missing information.
A Simple Countdown
- Six weeks or more out: send the brief; get the 3D design and itemised price.
- Five weeks out: confirm the design and order the stand build.
- Four weeks out: sign off artwork; order venue services such as power and internet.
- Two weeks out: last date for portable displays and graphics.
- Show week: we build, you check the finished stand, and we dismantle after the show.
Before
After
Redblu in practice
Frequently asked questions
How many weeks before a show should I book my stand?
Aim to order your stand build about five weeks before the show, and allow more time if you can, especially for larger or technical builds and busy venues.
Can I still get a stand if I've left it late?
Often, yes, but expect fewer design revisions and less flexibility — shell scheme dressing generally accommodates a tight timeline better than a full space-only build.
Does the venue affect how early I need to book?
Yes. Busy venues such as the NEC or ExCeL book delivery slots and contractor capacity well in advance, and venue services often cost more when ordered late, so book earlier than five weeks for shows there.
How far in advance should I book a fixed-price package stand?
The same five-week guideline applies. A fixed-price package stand from the Stand Selector speeds up the quote stage, but graphics production and logistics still need the time, so order about five weeks before the show.
Does booking early get me a better price?
Not usually a discount, but it protects your preferred design revisions and build slot. A late brief tends to mean fewer revision rounds and less room to negotiate on cost, so booking early is less about a lower headline price and more about avoiding the compromises that come with a compressed timeline.
The takeaway